GTX / GT64 Panels
Duration 1 day
Team Tyco Security Products Training - EMEA
Topics
  • PowerMaster Overview
  • PowerG technology Overview
  • Panels installation
  • Compatible devices
  • System Programing
    • Zones enrolment and definitions
    • Comunication options
    • Control Panel options
    • Partitions
  • Working with the user menu
    • Configure Users
    • Enrol proximity tags
    • Data & Time
  • GPRS & TCP/IP Communication settings
  • Visonic App for mobile devices
  • Diagnostics
Pre-Requisites Objectives
This practical one full day programme covers the installation, configuration and operation of Visonic PowerMaster Wireless Alarm System. All Students will have access to a panel, keypad and detectors and will each be required to program a panel.

Audience
Technicians wishing to Install and Program a Visonic Alarm System.

Pre-Requisites
  • Understanding of basic Intruder concepts
  • An understanding about the latest Windows Operating systems
  • A background with handling low voltage electronic devices.
Special Requirements Required Materials
  • Pen
  • Note Pad

Web Notes You can find all course descriptions in other languages here:  http://www.tycosecurityproducts.com/CourseDetails.aspx 
LocationLanguageStart DateAll DatesTimesPlaces AvailableTutorEnrol